AI Data Centre
EPC Services

ETAC delivers integrated Engineering, Procurement, and Construction (EPC) services for AI data centre power infrastructure, specializing in high-voltage and mission-critical electrical systems across North America.

Through a coordinated EPC execution model, ETAC manages the full project lifecycle, from system architecture and in-house transformer manufacturing to installation and commissioning.

As a result, projects benefit from a single accountable structure that ensures schedule control, technical alignment, and execution certainty.

ETAC AI Data Center EPC Services References
ai-data-center-infrastructure

Complete Power Platforms for AI Data Centers

ETAC delivers integrated AI power platforms combining in-house transformer manufacturing with full EPC execution under a single accountable structure.

In addition, this vertical integration reduces lead times, improves technical coordination, and enables scalable 20MW+ deployments for high-density AI infrastructure.

Our scope includes:

  • High-voltage substations

  • Medium-voltage transformers

  • Switchgear and protection systems

  • Paralleled generator systems

  • Utility coordination and commissioning

Each system is engineered for redundancy-ready performance and long-term operational stability.

Our Partners

Integrated 20MW+ EPC Delivery Model

ETAC delivers scalable 20MW+ AI data center power infrastructure within a structured 10–12 month EPC delivery framework.

By combining in-house transformer manufacturing with coordinated engineering, procurement, and construction, ETAC compresses deployment timelines while maintaining quality control and grid compliance.

Therefore, this integrated model reduces supply chain risk and enables accelerated power delivery for large-scale AI facilities.

ai-data-center-server-room

20MW+ AI Data Center EPC Lifecycle